MEJILLONES PORT COMPLEX, TERMINAL 1 |
||
|
Location |
Mejillones, II Region - CHILE |
|
|
Characteristics |
Construction of first step of Port Complex, with 3 mooring sites of 14m deep (sites 1 & 2) and 12m deep (site 3) for 50,000 DWT design ships. Later it is added site 4, for 180m long ships. Also includes the construction of a 200m long breakwater, 54,000 m2 maritime level space, 70,000 m2 remote storage level space (both with prefabricated concrete paving blocks), port access ways, railroads, Port administration building, warehouses, supply and erection of 35 ton crane, complementary works, etc. The port with his first three initial sites will have capacity for 2 millions ton/year to loading copper cathodes, containers and general cargo. |
|
|
Work's Main Figures |
Supply and driving of steel piles (296 un.) | 4,785 ton. |
| Supply and driving of steel sheet piles (2,846 un.) | 10,248 ton. | |
| Dredging | 1,024,292 m3 | |
| Excavations | 290,203 m3 | |
| Fill | 286,709 m3 | |
| Compacted wheel base | 93,924 m3 | |
| Maritime fill | 447,728 m3 | |
| Supply and erection jetty rock and protection core | 41,588 m3 | |
| Supply and erection jetty protection core-loc system | 3,278 m3 | |
| Structural reinforced concrete | 19,207 m3 | |
| Prefabricated concrete paving blocks | 131,794 m2 | |
| Asphalt concrete Pavement | 3,856 m3 | |
| Railroads | 5,305 m. | |
| Bitts supply and erection | 35 un. | |
| Fenders supply and erection | 54 un. | |
| Buildings and warehouses | 3,945 m2 | |
| Electrical erection | US$ 1,804,000 | |
| Potable water and sewage system | US$ 864,000 | |
| Cathodic Protection | US$ 581,450 | |
|
Type of Contract |
Engineering, Procurement, Construction and Concession |
|
|
Execution period |
December 2001 - March 2004 |
|
|
Owner |
Compaņia Portuaria Mejillones S.A. |
|