ELECTROANDINA POWER PLANT - MARINE WORKS |
||
|
Location |
Tocopilla, II Region - CHILE |
|
|
Characteristics |
Siphon for sea water supply , through a pipe of 2,000 mm diameter and 320 m long, hanged from a steel structure, founded on driven steel piles anchored to the rock by drilling the rock and grouting a 10" steel pile. With the same construction system, it was constructed an outlet pipe of 1,600 mm diameter and 70 m long. Both structures include walkways, handrail and lighting. The work also has a rock fender wall with a length of 250 m and it's background backfilling. |
|
|
Work's Main Figures |
Compacted Embankments |
133,597 m3 |
|
|
Armor Rock Protection (4 ton maximum size) |
61,721 m3 |
|
|
Geotextile |
10,572 m2 |
|
|
Concrete Foundations |
1,937 m3 |
|
|
Supply and Driving of Steel Piles (58 units) |
168 ton. |
|
|
Rock Drilling for Pile Anchorage |
468 m |
|
|
Supply and Erection of Pipe D=2,000 mm and D=1,600 mm |
282 ton. |
|
|
Supply and Erection of Steel Jacket and Steel Structure |
135 ton. |
|
Type of Contract |
Engineering, Procurement and Construction |
|
|
Execution period |
August 1998 - December 1999 |
|
|
Owner |
Electroandina S.A. |
|