NEW PASSENGER TERMINAL PRESIDENTE CARLOS IBAŅEZ DEL CAMPO AIRPORT IN PUNTA ARENAS |
||
|
Location |
Punta Arenas, XII Region - CHILE |
|
|
Characteristics |
Construction of the new two levels passenger terminal, with three mobile boarding bridges, three baggage transport conveyors belts, two hydraulyc elevator, one material hoist, one mechanical stairway, etc. Also is included road engineering, potable water and sewage treatment plant with complete external piping, car parking, hangars with airplane platforms and access roads, heating system, fire detection and combat system, CCTV, flight information system, loudspeakers, etc. | |
|
Work's Main Figures |
Built surface |
6,500 m2 |
|
|
Excavations |
40,000 m3 |
|
|
Compacted Fill |
15,000 m3 |
|
|
Structural Concrete |
2,000 m3 |
|
|
Steel Structures supply and erection |
180 ton |
|
|
Asphalt Pavements |
1,600 m3 |
| 3 Boarding Bridges erection | ||
|
Execution period |
June 2000 - February 2002 |
|
|
Owner |
Austral Sociedad Concesionaria S.A. |
|