"OBRAS CIVILES TRAMOS F, G y H DE LINEA 5 DEL METRO DE SANTIAGO" - CHILE |
||
|
Location |
Santiago, Region Metropolitana - CHILE |
|
|
Characteristics |
Construction of all "Linea 5" civil works viaduct, with 5,948m long and 6 elevated passenger stations. The viaduct has prefabricated beams of 27m to 36m long, trussed slabs over post stressed column caps on reinforced concrete columns. | |
|
Work's Main Figures |
Excavation |
24,878 m3 |
|
|
Compacted backfill |
23,878 m3 |
|
|
Structural Concrete |
21,348 m3 |
|
|
Concrete Pavement t=25 cm |
31,135 m2 |
|
|
Asphalt Pavement t=5 cm average |
10,128 m2 |
|
|
Steel Pipe Erection D=500mm to 700 mm |
2,086 m |
|
|
Concrete Pipe Erection D=500mm to 700 mm |
1,249 m |
| Concrete Pipe Erection D > 700 mm |
3,176 m |
|
| Architectural Finishing |
10,407 m2 |
|
| Steel Structures Erection |
1,054 ton |
|
|
Execution period |
November 1994 - December 1996 |
|
|
Owner |
Empresa de Transporte de Pasajeros Metro S.A. |
|