EARTHWORKS, DAMS, ROADS & BRIDGES
Since its beginning, BELFI was committed to the road system works throughout the country (Chile). The incorporation of heavy machinery and specialized equipment fits out the company to perform important earth movements, whether in construction of harbors, hydraulic works or in infrastructure for large mining projects.
"Construction of Platforms, Roads and Tailings Dam Las Tórtolas". New dam near the city of Colina, replacing the old one existing in Perez Caldera, with more than 1.100.000 m3 excavation and 25.000 m3 rock excavation. Client is Cia. Minera Disputada de Las Condes S.A. |
"Reposición Ruta 5 Norte, sector Longotoma - Puente El Chivato". Repaving with asphalt concrete along 24 km, including third track in some sectors and railroad overhead crossing in Longotoma. For the Dirección de Vialidad del Ministerio de Obras Públicas. |
"Project Loncoche - Villarrica Road". Paving with double surface treatment for this contract performed for Dirección de Vialidad del Ministerio de Obras Públicas. |
"Construcción Peralte Tranque El Cobre N° 4". The Company executed the 2nd stage and next the 3rd stage of the wall raising for the copper tailings dam, performed for Cia. Minera Disputada de Las Condes S.A. |
Asphalt Plant installed in City of Copiapo (North of Chile), used for "Reposición Ruta 5, Camino Longitudinal Norte, Sector Copiapó - Caldera". Client was Dirección de Vialidad del Ministerio de Obras Públicas. |