Viña del Mar Submarine Outfall

VIÑA DEL MAR SUBMARINE OUTFALL  -  V REGION

Location

City of Viña del Mar, V Region - CHILE

Characteristics

Construction of a terrestrial section (HDPE pipe 1.000mm diameter and 747m long) and a submarine outfall (HDPE pipe 1.200mm diameter and 1.495m long),  two temporary wharfs (one for pipe launching and one for reception), sheet pile driving, structural concrete, pavements, steel structure erection and 1.150m3 of rock coastal protection. The maximum depth of submarine outfall was 58 m.

Work's Main Figures

Trench Excavation

6.858 m3

 

Dredging

4.500 m3

 

Compacted backfill

6.285 m3

 

Concrete

1.102 m3

 

Concrete Pavements (0,2 m height)

1.878 m2

 

Submarine erection PECC Pipe  D=1200

1.415 m

 

Submarine erection PECC Pipe  D=800

30 m

Submarine erection PECC Pipe  D=500

20 m

Underground erection PECC Pipe D=1000

777 m

Piping and Steel Structure Erection

US$ 104,000

 

Steel Pile and Steel Sheet Pile Driving

774 Ton

Execution period

June 1996 - December 1996

Owner

ESVAL - Empresa de Servicios Sanitarios de Valparaíso

 